Volcanic eruptions from Bali’s Mount Agung earlier last week forced the closure of WADD/Denpasar and WADL/Lombok airports, as volcanic ash spread across both islands.
Here’s the current situation at the airports on Dec 4:
- WADD/Bali: Re-opened on Nov 29. (Although the airport will be closed for runway repair from 18-23z daily [except Saturdays] until Dec 31).
- WADL/Lombok: Re-opened on Nov 30.
- WARR/Juanda: Open and operating. So far has not been affected at all by the volcanic ash. (Although the airport will be closed for runway repair from 16-22z daily until Jan 06).
Although Mount Agung has now stopped emitting ash, another large eruption is still likely. The local monitoring agency are registering powerful and continuous tremors, and authorities have ordered locals and journalists within 10km of the volcano to evacuate. Further intermittent airport closures are possible, depending on wind direction.
We will keep this page updated with the latest news as we get it.
More on the topic:
- More: March 2024 Singapore Airspace Changes
- More: North Atlantic Volcanic Threat
- More: Ops in Indonesia: Is it safe?
- More: Bali bound and no place to go…
- More: Keep an eye on Shiveluch
More reading:
- Latest: 2024 Flight Ops Changes: The Big Ones
- Latest: High levels of Pilot Error with NAT RCL: New Briefing and Checklist
- Latest: US FAA Improves Flight Tracking Privacy
- Safe Airspace: Risk Database
- Weekly Ops Bulletin: Subscribe
- Membership plans: Why join OPSGROUP?